A sub, and one we book, schedule and stand behind
Erection is subcontracted, the same as permits and concrete. What you are buying is that the scheduling is our problem, not that there is no sub.
A sub. Same as the slab, same as the permit
Three parts of this job are subcontracted to standing partners: the permit, the concrete, and the erection. We would rather write that down than have you find it out from a truck with somebody else's name on it.
It is worth being blunt about, because this industry oversells it constantly. "One crew, no subs" is close to a slogan, and it is very rarely true of the whole job.
What you are actually buying
Not the absence of a sub. The absence of the coordination.
- One contract and one phone number, from the first sketch to the last screw.
- We book the trades and hold the order they come in, so the sequencing is our problem.
- The crew works to the drawing the steel was cut from, not to a sketch they were handed.
- If something is wrong afterwards, you call us. Whose truck it was is our business.
Anyone who has managed a build themselves knows that the gap between trades is where the weeks go. That gap is what you are paying somebody to own.
Why this page exists at all
Because for a while this site said otherwise. Two pages claimed the frame was set by our own crew, which nobody had actually asked about, and both were corrected the day the question got put properly.
Somebody told "no subs" who then meets a sub feels lied to even when the job goes perfectly, and the job usually does go perfectly. It is not worth the sentence.
One thing that is genuinely ours
The steel. It is rolled in Azle, on our own line, which is why a panel that turns up short is a phone call rather than a reorder from a supplier with its own lead time. That part is not coordination — that is the mill.
The other things people ask
- I already have a concrete guy — why is a slab on my quote?Concrete is subcontracted to standing partners. You can keep your own pourer, and here is exactly what changes if you do.
- 14 gauge or 12 gauge — what am I actually buying?Two quotes for the same size building usually differ here first. What each gauge is for, and when the answer is neither of them.
- Vertical roof or A-frame — does it actually matter?Two hard rules rather than a preference: horizontal roofs stop at 31 ft, and insulation needs a vertical roof to go on.
- Do I need a permit, and who pulls it?Permitting is subcontracted to standing partners and managed by us. What we need from you, and what nobody can tell you over the phone.
- Why do 14 ft legs cost more than 12 ft?Taller legs mean longer wall sheet, more frame and more wind load. Tell us the tallest thing going inside and we will tell you the leg.
- How far do you deliver, and is it in the price?That is what the ZIP box on the quote form is for. Why it is separate, and why a quote without it is not a quote.
- What do you need from me to quote in 24 business hours?The clock starts when we have enough to price against. This is the whole list, so the first call can be the only call.

Send us the dimensions
Width, length, leg height and a ZIP is enough to start. If you would rather say it out loud, the yard is open Monday to Friday, 8AM – 6PM CST.